Parking Lot
Projects > Depot Projects
22_012322-Depot
Parking Lot project
To: Depot management/Personnel
Depot
Parking Lot Project
1. All
trees and Stumps to be removed - Southwest corner – tree
removal (some on City property –
Large tree north side of property
(DJR property) - trimmed or removed?
2. Large
rocks removal
3. West
side drainage ditch – City? (… should be clear to allow natural
drainage to Highway 48)
4. South
side drainage ditch with small berm (with RR ties?)
as south boundary. (may be considered: bury a seepage drain
sleeved perf-pipe to southwest corner, or just a shallow ditch filled with
gravel??)
5. Railroad
ties – north side & south side boundaries (to
control/manage gravel for easier maintenance, and on south side to control rain
run-off)
6. Railroad
ties – east side and west side (to control/manage gravel – easier
maintenance)
7. Vehicle
Entry/Exit on northwest corner of lot – (gravel entry to
street)
8. Vehicle
Entry/Exit on east end of lot - (gravel
entry to street/pavement)
9. To
be considered - Southeast corner of lot – pole/yard light
10. To
be considered - Southeast corner – railroad ties (?) stairs to Depot facilities
Opinion:
- Dirt work to shape lot according to best drainage and layout –
- no need for any dirt removal
- dirt cut from east entry should be merged into lot
- Dirt work to shape lot according to best drainage and layout –
- no need for any dirt removal
- dirt cut from east entry should be merged into lot
Question(s)
Has the City (department) been contacted for permit to use residential lot for parking lot?
permit to do extensive dirt work?
Has the City (department) been contacted for permit to use residential lot for parking lot?
permit to do extensive dirt work?